full
image
#666666
http://www.smseals.com/wp-content/themes/zap-installable/
http://www.smseals.com/
#4a90c2
style4
Phone: +44(0) 1460 279541

24
Jun

S M Seals will be at Hydrovision International on Stand 944 in Nashville TN USA

July 22nd to July 25th

Please feel free to visit us and discuss your sealing requirements

 

0 No comments
05
Jun

We are pleased to announce that Mr. Andres Elizarraras, a citizen and resident of Mexico, will be joining the BDI/IMCI family of companies on June 1, 2014 as Regional Sales Manager for Mexico And Central America. In this newly created position, Andres will be responsible for the promotion and sale of products offered by Bijur Delimon, Hellan Strainer Company and S M Seals throughout this region.

Andres comes to the BDI/IMCI Team well qualified to assist us in growing our respective businesses. With a background in Industrial Engineering, Andres began his career with Plastimarx and Anco de Mexico, first in the manufacture and engineering of products and the making his way up through those organizations gaining experience in various aspects of business and supplier development. For the past 23 years, he has been associated with Fawick and Delamac de Mexico, where he became thoroughly familiar with the Bijur Delimon (Farval) and Hellan Strainer product lines while infterfacing with the Mexican and South American metalworking, steel, cement and petrochemical industries while serving Delamac in the position of Sales Manager, and most recently as Manager of Engineering Services.

Andres, his wife Patricia and their four sons reside in Tlalnepantla, Mexico.

Please join us in welcoming Andres to the BDI-IMC/IMCI family.

0 No comments
24
Apr

One of the best indicators of conditions at the seal face is temperature, and S M Seals developed a system for measuring the temperature of water that has passed across the seal face.  This enabled condition monitoring with additional functions of alarms and trips should the flow be interrupted, therefore preventing catastrophic failure due to a malfunction of the water supply.  Our system, when combined with other telemetry, is being now developed to enable automatic optimisation of the seal interface flow for any given operational condition.

0 No comments
13
Nov

Britain’s new primary dam will be one of the largest, most technologically advanced hydropower stations in the world. It is expected to produce 40 billion kilowatts of electricity, through the use of 12 Klipinger Bulb style turbines. At full capacity, the new facility would produce enough power to sustain the electrical requirements of 300,000 homes throughout Britain.
SM Seals has been selected to provide the mechanical seals for all twelve of the 900mm/500 rpm turbine shafts buried within the facility. The entire project is estimated to take 12 years to complete, employ more than 1,400 residents, and require a support staff of 350 once operational.

0 No comments
default
Loading posts...
link
#5C5C5C
on
loading
off